Grand Paris Express construction site
ECE-COGEMACOUSTIC MANUFACTURED THE VENTILATION EQUIPMENT FOR THE CONSTRUCTION OF THE CHAMPIGNY CENTER STATION (CHC, GRAND PARIS LINE 15, T2B LOT)
Thanks to teamwork with our client, the RAZEL-BEC – EIFFAGE consortium, we have implemented a ventilation strategy adapted to the excavation of major structures.
A mixed blowing-suction system allows, at the same time, the renewal of air inside the station and the extraction and treatment of dust using a dust collector installed on the surface.
COGEMACOUSTIC is acting on most of the construction sites of the Grand Paris Express project
Photo credit line 15 map : Société du Grand Paris